Software

EICR codes C1, C2, C3 and FI explained for contractors

C1 and C2 make an EICR unsatisfactory. Since Amendment 4, C3 and FI don't. What each code means, what changed in 2026, and what to do with the faults once the report's written.

By Quam Balogun, Founder17 November 2026 · 5 min read
An electrician testing a consumer unit in a hallway with a multifunction tester
In this guide
  1. 01What each code means now
  2. 02What changed with FI
  3. 03The landlord side still says 28 days
  4. 04A worked example
  5. 05Getting a whole team to code the same way

So on an EICR, C1 means danger present and something needs doing straight away, C2 means potentially dangerous and it needs doing urgently, C3 means an improvement is recommended, and FI means further investigation is advised. Under BS 7671:2018+A4:2026, only C1 and C2 make the report unsatisfactory. C3 and FI are advisory and don't change the overall outcome, which is a change from how a lot of firms were taught to code.

What each code means now

The wording below is the Amendment 4 wording, as NICEIC sets it out on its Amendment 4 page. Amendment 4 was published on 15 April 2026 and became the only current version of BS 7671 on 15 October 2026, so anything your engineers write from here on should be coded this way.

CodeWhat it meansDoes it make the report unsatisfactoryWhat usually happens next
C1Danger present. Immediate remedial action is necessaryYesMade safe on the day where possible, then a repair quote
C2Potentially dangerous. Urgent remedial action is necessaryYesRepair quote goes to the customer
C3Improvement is recommendedNoListed as advice, the customer can choose to do it
FIFurther investigation is advisedNo, since Amendment 4Explained to the person who ordered the report

The table is a summary. For the full definitions and how to apply them, go to the regulations and the model forms in Appendix 6 of BS 7671, and the best practice guidance from the scheme you're registered with.

What changed with FI

The biggest thing that changed in Amendment 4 is FI. It used to read "further investigation required without delay" and an FI on the report made the whole thing unsatisfactory. Now it reads "further investigation is advised" and it sits with C3 as advisory.

The IET wrote a good piece on this in Wiring Matters, July 2026. Their point is that FI is for when the inspection or testing shows a possible safety issue that couldn't be fully worked out because of the extent or limits of the inspection. They say it shouldn't be needed in most cases.

They also give two examples of FI being used where it shouldn't. An unidentified circuit isn't an FI, it's a non-compliance that gets a code, and identifying the circuit is remedial work. A low insulation resistance reading isn't an FI either. It gets coded, and finding the cause is fault-finding, which is separate from the inspection.

What that means for you as the business owner is your engineers' habits might need checking. If someone's been putting FI on anything they weren't sure about, those reports now come out satisfactory when the engineer actually meant "this needs looking at". That's a conversation worth having with the team before the next batch of tests goes out.

The landlord side still says 28 days

This is where it gets a bit messy. The gov.uk guidance for private and social landlords, published 1 November 2025, still lists FI as "further investigation required without delay". It says where the report shows remedial or further investigative work is necessary, the landlord has to get it done within 28 days, or sooner if the report says so. Then they have to give the tenant and the local council the report and written confirmation from the qualified person who did the work.

That guidance came out before Amendment 4, so it uses the old FI wording. We're not going to guess how the government will line it up. If a lot of your work is for letting agents and landlords, keep an eye on that gov.uk page and ask your scheme how they want FI handled on rented property reports in the meantime.

What doesn't change is C1 and C2. If a rented property has either, the landlord's 28 days starts, and they'll want a repair quote from you quickly.

A worked example

Say a good chunk of your work is EICRs for three letting agents. One of your lads tests a two-bed flat and finds this:

  1. Exposed live parts on a damaged socket in the kitchen. That's danger present, so it's a C1 and he makes it safe before he leaves.
  2. Scorching round a loose connection behind a bedroom socket. He judges it potentially dangerous and codes it C2.
  3. An older consumer unit that's working fine but he'd recommend upgrading. He records that as C3.
  4. A circuit he couldn't trace because the loft was boarded and locked. He can't fully see it, so it's an FI with a note saying why.

The report's unsatisfactory because of the C1 and the C2. The C3 and the FI are advice. The landlord now needs the C2 fixed, and probably wants a price for the C3 while you're there.

Whether it was coded C2 or C3 is the engineer's call, made on site with the regulations and the guidance. Software shouldn't be making that call, and neither should the office.

Getting a whole team to code the same way

When you've got 35 engineers doing EICRs, what worries me more than one bad report is ten engineers coding the same thing ten different ways, and the customer noticing. One landlord gets a C2 for something another engineer gave a C3 at the flat next door, and now you're explaining yourself to the letting agent.

So a few things we'd do after Amendment 4:

  1. Get everyone onto the same wording. The forms they fill in should use the Amendment 4 codes and nothing older, so nobody's still writing "without delay" next to an FI.
  2. Agree as a team what you code for the things you see every week. Your scheme's guidance is the place to settle arguments, not whoever shouts loudest in the van.
  3. Have someone senior read a sample of reports each month, especially the FIs, because those are the ones most likely to be used as a "not sure" box.
  4. Make sure every observation has a photo and a plain sentence the customer can understand, so the code isn't the only thing they see.

In Agentryx One, engineers fill in the EICR on the phone, circuit by circuit to the BS 7671 model form, and it works with no signal. The faults then go onto a repair quote with the photos the same day, and your team sets the price, the AI doesn't price anything. There's more on the field app page, and the quoting side is on the EICR remedial quotes page.

If you want to see how a coded EICR turns into a quote and a booked job on your own setup, you can book a demo.

See Agentryx One with your own operation.

Start with a 30-minute call. We look at how your business runs and build a demo of your system before we speak again.

Book a demo