The RAMS template
Part one is the risk assessment. It follows the steps in HSE's guidance on managing risk, which goes identify the hazards, assess the risks, control them, record what you found and review it. Copy one row per hazard.
| Risk assessment field | What goes in it |
|---|---|
| Job and site | Job number, site address, client, principal contractor if there is one |
| Assessed by and date | Name, role, date, and the date it'll be reviewed |
| Hazard | One hazard per row, such as live conductors, working at height, possible asbestos, dust, lone working, manual handling |
| Who could be harmed | Your engineers, other trades, the client's staff, the public, tenants |
| How they could be harmed | In plain words, such as an electric shock from a circuit thought to be dead |
| Controls already in place | What you're already doing about it |
| Extra controls needed | Anything else that's needed for this job on this site |
| Who does it and by when | A name, not a job title |
Part two is the method statement, which is the job in the order it'll actually happen.
| Method statement field | What goes in it |
|---|---|
| Scope of work | What's being done and where, in a couple of lines |
| People | Who's on the job, who's in charge, their qualifications and cards |
| Arrival and welfare | Where to sign in, parking, toilets, site induction |
| Safe isolation | Which circuits or supplies get isolated, how they're locked off, who keeps the key, how it's proved dead |
| Sequence of work | Numbered steps from setting up to handing over |
| Plant, tools and test equipment | Access equipment, power tools, voltage indicator and proving unit, test meter with calibration date |
| PPE | What's needed for this job |
| Permits | Any permit to work, hot works or access permit the site needs |
| Other trades and the public | How the area is kept clear, signs and barriers |
| Emergency arrangements | First aider, nearest A and E, fire assembly point, who to call |
| Waste | What's taken away and how |
| Sign-off | Each person who'll do the work signs to say they've read it and understood it |
Writing the safe isolation part
This is the bit of an electrician's RAMS that matters most, so it's worth getting right. HSE's guidance HSG85, Electricity at work: safe working practices is free to download and goes through it properly.

The starting point is that you plan to work dead. Live working is only allowed under regulation 14 of the Electricity at Work Regulations 1989 when it's unreasonable for the conductor to be dead, reasonable for the person to work on it live, and suitable precautions are in place. If any one of those isn't met, it has to be done dead. If you think the job needs live work, the RAMS has to say why.
So in the method statement you'd write which supplies you're isolating and how. Then how it's secured, which usually means a lock with your own key and a notice at the point of isolation. Then proving dead, with a proper voltage indicator that you check on a proving unit before and after. HSG85 says non-contact testers aren't suitable for proving dead on low voltage systems, so don't write "checked with a volt stick".
How to fill it in for the actual job
What ends up happening at a lot of firms is one RAMS gets written for "electrical work" and then sent out for every job for years. A main contractor reads that and knows straight away nobody's thought about their site.
So the first thing you do is look at the site, or ask the client for photos and drawings if you can't get there. Then write down the hazards that are actually there. A rewire in an occupied house has different risks to a board change in a plant room. Then the sequence of work, in order, the way your engineers will do it. And then get every person on the job to sign it before they start.
If you employ five or more people, HSE says you must record your significant findings. Even if you don't, a main contractor will usually want to see it before you get on site.
When a template isn't enough
A template helps you not forget things. It doesn't know the site. If the job involves high voltage, work near overhead lines, confined spaces or anything the template doesn't cover, get someone competent to write that part. Same if the principal contractor has their own RAMS format, use theirs.
And if your engineers are signing a sheet in the van that nobody in the office ever sees, you've got paper, but you can't show anyone it was done before the job started.
Or do it on the phone in Agentryx One
In Agentryx One the risk assessment is signed on the engineer's phone before the job starts, and it's kept with the job. It works with no signal and syncs later, like everything else in the field app. Staff tickets are kept with their expiry dates too, so you know before someone's card runs out and you send them to a site that'll turn them away.
The rest of the job runs the same way, from the job sheet to the certificate to the invoice. There's the full picture on the electrical contractors page.
Joblogic and BigChange both do RAMS as well. As of November 2026, from their websites, Joblogic has a RAMS module and a lone worker module, and BigChange has risk assessments that have to be done before a job starts, plus a RAMS template on its blog. If lone worker check-ins are what you need most, Joblogic's module is worth looking at, because that's something we don't have.
How pricing works
The template is free. Agentryx One doesn't have published prices. It depends on how many sites and people it covers, and you see it working at one site before you pay for the rest. More on that in how much job management software costs.
Frequently asked questions
Is this RAMS template free?
Yes. Copy both tables into Word or a spreadsheet and fill them in for each job.
What does RAMS stand for?
Risk assessment and method statement. The risk assessment says what could go wrong and what you're doing about it. The method statement says how the job will be done.
Is a RAMS a legal requirement for electricians?
Employers have to assess the risks, and HSE says if you employ five or more people you must record your significant findings. A method statement is how most contractors show the work will be done safely, and main contractors usually ask for one.
What should the safe isolation section say?
Which supplies are isolated, how they're locked off and who has the key, the notice at the point of isolation, and how it's proved dead with a voltage indicator checked before and after. HSE's HSG85 covers it in detail.
How much does Agentryx One cost?
There's no published price. It depends on how many sites and people it covers, and you see it working at one site before you pay for the rest.
Does Joblogic have a RAMS module?
Yes, as of November 2026, from their website, Joblogic has a RAMS module and a lone worker module. Agentryx One has risk assessments signed on the phone before the job starts, but no lone worker check-ins.
Can I reuse the same RAMS on every job?
You can reuse the layout, but the hazards, the sequence and the isolation details need to match the job and the site.