EICR template, every section of the report in order

Every section of the report in order, free to copy

This free EICR template lays out every part of an electrical installation condition report in the order the BS 7671 model form uses, from the client details and the extent of the inspection to the observations, the supply details and the schedules of circuits and test results. Use it to plan the job and make sure nothing gets missed. For the report you actually hand over, use the model form from the IET or your scheme.

An electrician testing circuits at a consumer unit in a flat
On this page
  1. 01The EICR template
  2. 02What the observation codes mean
  3. 03How to fill it in, in the order you'd actually do it
  4. 04When this template isn't enough
  5. 05Or do it on the phone in Agentryx One
  6. 06How pricing works
  7. 07Frequently asked questions
01

The EICR template

Copy this into a spreadsheet or a Word doc, or print it and take it on site. The section names follow the layout of the IET's BS 7671 model forms, but the wording in the columns is ours.

SectionWhat you fill inTip
Details of the clientName and address of the person or company ordering the reportOften the landlord or the agent, not the person living there
Details of the installationAddress, who occupies it, what kind of premises, estimated age of the wiring, any signs of changes, date of the last inspection if knownAsk for the last report before you go
Purpose of the reportWhy it's been asked for, such as a tenancy, a sale, an insurance request or a routine checkThe purpose often decides how far you go
Extent and limitationsWhat you inspected and tested, what you didn't, and why. Agreed limitations with the client and anything you found you couldn't get to on the dayAgree this before you start and write who agreed it
Summary of the conditionThe general condition of the installation in plain words and the overall assessment, satisfactory or unsatisfactoryFill this in last
RecommendationsWhen the next inspection should be and what needs doing firstMatch it to the codes you've given
DeclarationWho inspected, who authorised the report, signatures, dates, your company and scheme detailsCheck the scheme number is right
ObservationsEach item found, where it is, and a code (C1, C2, C3 or FI)One line per item, with a photo reference
Supply characteristics and earthingSystem type, number and type of live conductors, nominal voltage and frequency, prospective fault current, external earth fault loop impedance, supply protective deviceWrite down how you got each value
Particulars of the installation at the originMeans of earthing, earth electrode if there is one, main switch or circuit breaker, earthing conductor, main protective bonding to water, gas and other servicesNote sizes and where the bonding connects
Schedule of inspectionsEach inspection item ticked, marked not applicable, or codedDon't leave blanks, use N/A or LIM
Schedule of circuit detailsEvery circuit on each board, with its description, wiring type, reference method, number of points, conductor sizes and protective deviceDo one schedule per distribution board
Schedule of test resultsContinuity, insulation resistance, polarity, earth fault loop impedance and RCD test results for each circuit, plus the test instruments usedRecord serial numbers of your test kit
02

What the observation codes mean

This is the part customers read first, so it's worth being clear. NAPIT's Codebreakers guide goes through how to code individual items if you want more detail.

An electrician writing up test results at the kitchen counter after an inspection
CodeWhat it meansEffect on the report
C1Danger present, someone could get hurt nowUnsatisfactory, make it safe straight away
C2Potentially dangerous, needs putting right urgentlyUnsatisfactory
C3Improvement recommended, but not unsafe as it standsDoesn't make it unsatisfactory on its own
FIFurther investigation needed without delayUnsatisfactory until it's looked into
03

How to fill it in, in the order you'd actually do it

So the first thing is the paperwork before you go. Get the client details, the address, the purpose and the last report if there is one, and agree the extent and limitations with whoever's ordering it. A lot of arguments later come from nobody writing down that the loft wasn't accessible.

Then on site you'd usually start with the supply and the origin, because you need the earthing arrangements and the external loop impedance before the circuit results make sense. After that it's the inspection schedule and then the circuit details and test results, one board at a time.

Write the observations as you find them, with where they are and a photo. And then the summary and the overall assessment go in at the very end, once you've seen everything. If you write the summary first you end up changing it.

The IET page says you can use and electronically change its model forms for your own contracting work, but not copy blank forms to sell. Read the terms on that page before you build your own version.

04

When this template isn't enough

This is a checklist and a planning sheet. It isn't the certificate. If you're registered with NICEIC, NAPIT or another scheme, issue the report on your scheme's form or software. NICEIC's certification page explains what they provide for registered businesses, and the IET publishes the model forms themselves.

It also stops working once you've got a lot of engineers. Say you've got 25 engineers doing three or four EICRs a week each. That's paper or spreadsheets coming back to the office from every van, someone typing up the observations, and the C2s sitting in a pile waiting for a repair quote.

05

Or do it on the phone in Agentryx One

In Agentryx One your engineers fill in the EICR on their phone, circuit by circuit, to the BS 7671 model form. It works with no signal and syncs later. You can see how that works on the field app page.

The faults found on the test, such as C2s, go onto a repair quote with the photos the same day. Your team sets the price, the AI doesn't. The customer ticks the repairs they want online and each tick becomes a booked job. The full flow is on EICR remedial quotes. And when the next one's coming due, the customer gets a text with a link to pick a time. The EICR due checker helps you work out the dates.

Tradify and Joblogic both have EICRs too. As of November 2026, from their websites, Tradify has a free EICR template page and a long list of certificate forms, and Joblogic has a free Electrical Industry Pack with EICR, EIC and emergency lighting certificates. If you're a small firm and want a certificate tool you can set up yourself, either of those is a sensible place to look.

06

How pricing works

The template on this page is free. Agentryx One doesn't have published prices. It depends on how many sites and people it covers, and you see it working at one site before you pay for the rest. There's more on how this market prices things in how much job management software costs.

07

Frequently asked questions

Is this EICR template free to use?

Yes. Copy the table into whatever you use. It's a layout of the sections, written in our own words, so you can plan the job and check nothing's missing.

Can I hand this over as the EICR certificate?

No. Use the IET model form or your scheme's form for the report you give the customer. This template is for planning and checking.

Where do I download the official EICR form?

The IET publishes the BS 7671 model forms on its website, and NICEIC and NAPIT give registered businesses their own versions. Check which edition of BS 7671 the form is for before you use it.

What makes an EICR unsatisfactory?

Any C1, C2 or FI on the report makes the overall assessment unsatisfactory. C3 items on their own don't.

How much does Agentryx One cost for EICRs?

There's no published price. It depends on how many sites and people it covers, and you see it working at one site before you pay for the rest.

Is this the same as the Tradify EICR template?

They're both free layouts of the same report. Tradify's links to their own certificate software. Ours links to Agentryx One, where the engineer fills it in on the phone and the faults go straight onto a repair quote.

Can engineers fill in an EICR on a phone with no signal?

In Agentryx One, yes. It's filled in circuit by circuit and syncs once they're back in signal.